KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  12-18-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  D55/1

Drilled the right side hopefully with the correct alignment.
' style=

Marked the Middle of the Tube

Marked the Middle of the Tube

' style=

Markings at the correct Angle

Markings at the correct Angle

' style=

S-5 Drilling with 4.9mm

S-5 Drilling with 4.9mm

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.